{"id":6719,"date":"2026-10-13T12:58:11","date_gmt":"2026-10-13T12:58:11","guid":{"rendered":"https:\/\/livenation254.com\/?p=6719"},"modified":"2026-10-13T12:58:11","modified_gmt":"2026-10-13T12:58:11","slug":"voi-taveta-railway-rehabilitation-hits-40-kenya-eyes-boost-in-cross-border-trade","status":"publish","type":"post","link":"https:\/\/livenation254.com\/?p=6719","title":{"rendered":"VOI\u2013TAVETA RAILWAY REHABILITATION HITS 40% \u2014 KENYA EYES BOOST IN CROSS-BORDER TRADE"},"content":{"rendered":"<blockquote>\n<h1>VOI\u2013TAVETA RAILWAY REHABILITATION HITS 40% \u2014 KENYA EYES BOOST IN CROSS-BORDER TRADE<\/h1>\n<\/blockquote>\n<pre><strong>Jeff Kizzilah Digital Editor\u00a0<\/strong><\/pre>\n<p><strong>Kenya Railways MD Philip Mainga inspects works on the 120-kilometre railway line as project advances towards reconnecting Taita-Taveta County and Tanzania.<\/strong><\/p>\n<p><a href=\"https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895726622.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6720\" src=\"https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895726622-300x285.jpg\" alt=\"\" width=\"300\" height=\"285\" srcset=\"https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895726622-300x285.jpg 300w, https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895726622.jpg 720w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>The Voi\u2013Taveta Railway Rehabilitation Project has reached 40 per cent overall progress, marking a significant milestone in efforts to restore rail connectivity, improve transport efficiency and unlock cross-border trade opportunities between Kenya and Tanzania.<\/p>\n<p>Kenya Railways Managing Director Philip J. Mainga, EBS, on Tuesday led a site inspection to assess progress on the rehabilitation works, which are advancing along the 120-kilometre railway corridor.<\/p>\n<p>The progress has been driven largely by ongoing works on the railway subgrade and cross-drainage structures, which are essential to strengthening the railway infrastructure and supporting safe, reliable rail operations.<\/p>\n<p>Once completed, the project is expected to improve the movement of passengers and goods while stimulating economic activity and creating employment opportunities for communities along the railway corridor.<\/p>\n<h3>FIVE RAILWAY STATIONS SET FOR REHABILITATION<\/h3>\n<p>The rehabilitation project includes railway stations at Voi, Mwatate, Bura, Maktau and Taveta.<\/p>\n<p>The upgraded stations are expected to improve access to rail transport for residents, businesses and traders across Taita-Taveta County, while strengthening connections between local communities and regional markets.<\/p>\n<p><a href=\"https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895729178.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-medium wp-image-6721\" src=\"https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895729178-292x300.jpg\" alt=\"\" width=\"292\" height=\"300\" srcset=\"https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895729178-292x300.jpg 292w, https:\/\/livenation254.com\/wp-content\/uploads\/2026\/10\/FB_IMG_1791895729178.jpg 720w\" sizes=\"auto, (max-width: 292px) 100vw, 292px\" \/><\/a><\/p>\n<p>The railway branches off from Voi Meter Gauge Railway (MGR) Station on the Mombasa\u2013Nairobi main line, running southwest across Taita-Taveta County towards Taveta, near the Kenya\u2013Tanzania border.<\/p>\n<h3>KENYA\u2013TANZANIA TRADE IN FOCUS<\/h3>\n<p>A key strategic component of the project is the planned connection at Taveta to Tanzania&#8217;s railway network through the Holili border crossing.<\/p>\n<p>The link is expected to create new opportunities for cross-border trade, facilitate the movement of goods and strengthen regional economic integration.<\/p>\n<p>Improved railway connectivity could also support businesses by providing an additional transport option for moving commodities, accessing markets and connecting production centres with regional trade routes.<\/p>\n<h3>LOCAL ECONOMIES EXPECTED TO BENEFIT<\/h3>\n<p>Beyond transport infrastructure, the project is already creating employment opportunities and supporting economic activity within communities along the corridor.<\/p>\n<p>As rehabilitation works continue, the Voi\u2013Taveta Railway is expected to contribute to more efficient transport, expanded commercial opportunities and sustainable economic growth in Taita-Taveta County and the wider East African region.<\/p>\n<p>The achievement of 40 per cent progress marks an important stage in the railway&#8217;s rehabilitation, with the project&#8217;s long-term impact expected to depend on the completion of the works and the effective integration of the line into regional transport and trade networks.<\/p>\n<p><strong>LiveNation254 Media | Epaper Online News<\/strong><\/p>\n<p><em>Fastest and Credible<\/em><\/p>\n<p>www.livenation254.com<\/p>\n","protected":false},"excerpt":{"rendered":"<p>VOI\u2013TAVETA RAILWAY REHABILITATION HITS 40% \u2014 KENYA EYES BOOST IN CROSS-BORDER TRADE Jeff Kizzilah Digital Editor\u00a0 Kenya Railways MD Philip Mainga inspects works on the&hellip; <\/p>\n","protected":false},"author":2,"featured_media":6720,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[],"class_list":["post-6719","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy-and-investment"],"_links":{"self":[{"href":"https:\/\/livenation254.com\/index.php?rest_route=\/wp\/v2\/posts\/6719","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/livenation254.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/livenation254.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/livenation254.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/livenation254.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6719"}],"version-history":[{"count":1,"href":"https:\/\/livenation254.com\/index.php?rest_route=\/wp\/v2\/posts\/6719\/revisions"}],"predecessor-version":[{"id":6722,"href":"https:\/\/livenation254.com\/index.php?rest_route=\/wp\/v2\/posts\/6719\/revisions\/6722"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/livenation254.com\/index.php?rest_route=\/wp\/v2\/media\/6720"}],"wp:attachment":[{"href":"https:\/\/livenation254.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/livenation254.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/livenation254.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}